This work will include the demolition and replacement of approximately 55 feet of existing sidewalk, including the ADA curb-cut ramp, removal of existing solar street light, removal of existing tree, and the relocation of the existing street light.
Pedestrian restrictions will be in effect.
The work zone will require sidewalk closure and pedestrian control devices and signage will safely control the flow of pedestrians through and or around the work zone. The contractor plans to keep sidewalk closure to a minimum.
Please be advised that the schedule is subject to change due to unforeseen circumstances or inclement weather conditions.