<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	
	>
<channel>
	<title>
	Comments on: Senator Highway Closure	</title>
	<atom:link href="https://sedonaeye.com/senator-highway-closure/feed/" rel="self" type="application/rss+xml" />
	<link>https://sedonaeye.com/senator-highway-closure/</link>
	<description>Local News From All Points of View</description>
	<lastBuildDate>Wed, 23 Jul 2014 06:27:48 +0000</lastBuildDate>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.1</generator>
	<item>
		<title>
		By: Sedona 89A Switchbacks Lane UPDATE		</title>
		<link>https://sedonaeye.com/senator-highway-closure/comment-page-1/#comment-54192</link>

		<dc:creator><![CDATA[Sedona 89A Switchbacks Lane UPDATE]]></dc:creator>
		<pubDate>Wed, 23 Jul 2014 05:36:21 +0000</pubDate>
		<guid isPermaLink="false">https://sedonaeye.com/?p=40305#comment-54192</guid>

					<description><![CDATA[SR 89A reduced to one lane through switchbacks - Minimal delays expected as roadway striping underway 

Drivers can expect minimal delays as crews finish striping SR 89A through the switchbacks from Pine Flats Campground to the Vista Point Overlook. One lane will be closed during operations, with flaggers allowing alternating access for traffic. Striping is expected to be completed by Friday, and will be underway daily from 6 am to 6 pm during operations.

Traffic delays may occur during construction with traffic reduced to one lane. There will be directional signage and flaggers present during construction. 

ADOT advises motorists to be alert for construction equipment and personnel, and to proceed through the work zone with caution.]]></description>
			<content:encoded><![CDATA[<p>SR 89A reduced to one lane through switchbacks &#8211; Minimal delays expected as roadway striping underway </p>
<p>Drivers can expect minimal delays as crews finish striping SR 89A through the switchbacks from Pine Flats Campground to the Vista Point Overlook. One lane will be closed during operations, with flaggers allowing alternating access for traffic. Striping is expected to be completed by Friday, and will be underway daily from 6 am to 6 pm during operations.</p>
<p>Traffic delays may occur during construction with traffic reduced to one lane. There will be directional signage and flaggers present during construction. </p>
<p>ADOT advises motorists to be alert for construction equipment and personnel, and to proceed through the work zone with caution.</p>
]]></content:encoded>
		
			</item>
	</channel>
</rss>
