<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	
	>
<channel>
	<title>
	Comments on: Local AZ Interstate 17 Paving Project Begins Tonight	</title>
	<atom:link href="https://sedonaeye.com/local-az-interstate-17-paving-project-begins-tonight/feed/" rel="self" type="application/rss+xml" />
	<link>https://sedonaeye.com/local-az-interstate-17-paving-project-begins-tonight/</link>
	<description>Local News From All Points of View</description>
	<lastBuildDate>Sat, 02 May 2015 18:04:23 +0000</lastBuildDate>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.1</generator>
	<item>
		<title>
		By: Mike		</title>
		<link>https://sedonaeye.com/local-az-interstate-17-paving-project-begins-tonight/comment-page-1/#comment-110964</link>

		<dc:creator><![CDATA[Mike]]></dc:creator>
		<pubDate>Sat, 02 May 2015 18:04:23 +0000</pubDate>
		<guid isPermaLink="false">https://sedonaeye.com/?p=47064#comment-110964</guid>

					<description><![CDATA[Chili cook off in Sedona not really well attended and traffic moving well]]></description>
			<content:encoded><![CDATA[<p>Chili cook off in Sedona not really well attended and traffic moving well</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: Weekend Travel Advisory		</title>
		<link>https://sedonaeye.com/local-az-interstate-17-paving-project-begins-tonight/comment-page-1/#comment-110956</link>

		<dc:creator><![CDATA[Weekend Travel Advisory]]></dc:creator>
		<pubDate>Fri, 01 May 2015 23:23:30 +0000</pubDate>
		<guid isPermaLink="false">https://sedonaeye.com/?p=47064#comment-110956</guid>

					<description><![CDATA[Drivers should be aware of the following restrictions:

    Eastbound Interstate 10 (toward Tucson) narrowed to one lane between Chandler Boulevard and Queen Creek Road from 10 p.m. Friday to noon Saturday
    Westbound Interstate 10 (toward Phoenix) narrowed to one lane between Riggs Road and Wild Horse Pass Boulevard from 10 p.m. Saturday to noon Sunday
    Westbound Loop 202 (Red Mountain Freeway) closed between Greenfield Road and Country Club Drive in Mesa from 10 p.m. Friday to 5 a.m. Monday]]></description>
			<content:encoded><![CDATA[<p>Drivers should be aware of the following restrictions:</p>
<p>    Eastbound Interstate 10 (toward Tucson) narrowed to one lane between Chandler Boulevard and Queen Creek Road from 10 p.m. Friday to noon Saturday<br />
    Westbound Interstate 10 (toward Phoenix) narrowed to one lane between Riggs Road and Wild Horse Pass Boulevard from 10 p.m. Saturday to noon Sunday<br />
    Westbound Loop 202 (Red Mountain Freeway) closed between Greenfield Road and Country Club Drive in Mesa from 10 p.m. Friday to 5 a.m. Monday</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: More I-17 Road Construction Alerts		</title>
		<link>https://sedonaeye.com/local-az-interstate-17-paving-project-begins-tonight/comment-page-1/#comment-110860</link>

		<dc:creator><![CDATA[More I-17 Road Construction Alerts]]></dc:creator>
		<pubDate>Wed, 29 Apr 2015 20:01:26 +0000</pubDate>
		<guid isPermaLink="false">https://sedonaeye.com/?p=47064#comment-110860</guid>

					<description><![CDATA[The Arizona Department of Transportation will perform routine pavement maintenance overnight on northbound Interstate 17 at the Sunset Point traffic interchange (milepost 252) on Sunday, May 3, between 8 p.m. and 4 a.m. 

Drivers traveling through the work zone will be required to use the off and on-ramp at Sunset Point to continue on northbound I-17 during work hours. Minimal delays expected. 

Crews will also be working on southbound I-17 near the Bumble Bee traffic interchange (mileposts 246 to 249) on a three-mile segment for pavement repair on May 3 that will require a lane restriction between 10 p.m. and 6 a.m.     

The speed limit through the work zones will be reduced to 45 mph during work hours.]]></description>
			<content:encoded><![CDATA[<p>The Arizona Department of Transportation will perform routine pavement maintenance overnight on northbound Interstate 17 at the Sunset Point traffic interchange (milepost 252) on Sunday, May 3, between 8 p.m. and 4 a.m. </p>
<p>Drivers traveling through the work zone will be required to use the off and on-ramp at Sunset Point to continue on northbound I-17 during work hours. Minimal delays expected. </p>
<p>Crews will also be working on southbound I-17 near the Bumble Bee traffic interchange (mileposts 246 to 249) on a three-mile segment for pavement repair on May 3 that will require a lane restriction between 10 p.m. and 6 a.m.     </p>
<p>The speed limit through the work zones will be reduced to 45 mph during work hours.</p>
]]></content:encoded>
		
			</item>
	</channel>
</rss>
