<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	
	>
<channel>
	<title>
	Comments on: Grand Canyon North Rim Highway Reopens	</title>
	<atom:link href="https://sedonaeye.com/grand-canyon-north-rim-highway-reopens/feed/" rel="self" type="application/rss+xml" />
	<link>https://sedonaeye.com/grand-canyon-north-rim-highway-reopens/</link>
	<description>Local News From All Points of View</description>
	<lastBuildDate>Wed, 08 May 2013 20:52:21 +0000</lastBuildDate>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.1</generator>
	<item>
		<title>
		By: Dewey Humboldt Highway Improvement Update		</title>
		<link>https://sedonaeye.com/grand-canyon-north-rim-highway-reopens/comment-page-1/#comment-16136</link>

		<dc:creator><![CDATA[Dewey Humboldt Highway Improvement Update]]></dc:creator>
		<pubDate>Wed, 08 May 2013 20:52:21 +0000</pubDate>
		<guid isPermaLink="false">https://sedonaeye.com/?p=27584#comment-16136</guid>

					<description><![CDATA[RESCHEDULED: Pavement maintenance on SR 169 in Dewey-Humboldt postponed until July - The Arizona Department of Transportation has postponed a pavement improvement project that was scheduled to begin on May 6 on State Route 169 near Interstate 17 (mileposts 9-15) due to current weather conditions. Work will resume when temperatures become conducive for pavement work in July.]]></description>
			<content:encoded><![CDATA[<p>RESCHEDULED: Pavement maintenance on SR 169 in Dewey-Humboldt postponed until July &#8211; The Arizona Department of Transportation has postponed a pavement improvement project that was scheduled to begin on May 6 on State Route 169 near Interstate 17 (mileposts 9-15) due to current weather conditions. Work will resume when temperatures become conducive for pavement work in July.</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: Wickenburg Travel Alert - May 8 Delay		</title>
		<link>https://sedonaeye.com/grand-canyon-north-rim-highway-reopens/comment-page-1/#comment-16132</link>

		<dc:creator><![CDATA[Wickenburg Travel Alert - May 8 Delay]]></dc:creator>
		<pubDate>Wed, 08 May 2013 19:26:10 +0000</pubDate>
		<guid isPermaLink="false">https://sedonaeye.com/?p=27584#comment-16132</guid>

					<description><![CDATA[Roundabout work on US 93 in Wickenburg continues Wednesday tonight (May 8)  - Work will require restrictions at the north roundabout, delays of up to 30 minutes are expected. The Arizona Department of Transportation will make improvements to the north roundabout in Wickenburg on US 93, that will require lane restrictions on Wednesday, May 8 starting at 6 p.m. to 6 a.m. Thursday, May 9. The left lane through the roundabout will be restricted and traffic will be guided through the work zone with flaggers and delays of up to 30 minutes are possible. Restrictions for wide loads (maximum 10 feet wide) and a 75-foot length restriction will be in place until the work is completed.]]></description>
			<content:encoded><![CDATA[<p>Roundabout work on US 93 in Wickenburg continues Wednesday tonight (May 8)  &#8211; Work will require restrictions at the north roundabout, delays of up to 30 minutes are expected. The Arizona Department of Transportation will make improvements to the north roundabout in Wickenburg on US 93, that will require lane restrictions on Wednesday, May 8 starting at 6 p.m. to 6 a.m. Thursday, May 9. The left lane through the roundabout will be restricted and traffic will be guided through the work zone with flaggers and delays of up to 30 minutes are possible. Restrictions for wide loads (maximum 10 feet wide) and a 75-foot length restriction will be in place until the work is completed.</p>
]]></content:encoded>
		
			</item>
	</channel>
</rss>
