<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	
	>
<channel>
	<title>
	Comments on: AZ Interstate 15 Virgin River Gorge Bridge Project Update	</title>
	<atom:link href="https://sedonaeye.com/az-interstate-15-virgin-river-gorge-bridge-project-update/feed/" rel="self" type="application/rss+xml" />
	<link>https://sedonaeye.com/az-interstate-15-virgin-river-gorge-bridge-project-update/</link>
	<description>Local News From All Points of View</description>
	<lastBuildDate>Mon, 08 Jun 2015 23:34:41 +0000</lastBuildDate>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.1</generator>
	<item>
		<title>
		By: AZ I-40 Road Construction Begins		</title>
		<link>https://sedonaeye.com/az-interstate-15-virgin-river-gorge-bridge-project-update/comment-page-1/#comment-112291</link>

		<dc:creator><![CDATA[AZ I-40 Road Construction Begins]]></dc:creator>
		<pubDate>Mon, 08 Jun 2015 23:34:41 +0000</pubDate>
		<guid isPermaLink="false">https://sedonaeye.com/?p=48191#comment-112291</guid>

					<description><![CDATA[The Arizona Department of Transportation will begin a road improvement project on Monday, June 15, to resurface eightteen miles of Interstate 40 through the city of Winslow (milepost 250-268). 

The $9.3 million project will include removing and replacing the existing asphalt eastbound and westbound, removing and replacing the State Route 87 bridge deck, which crosses I-40, and installing new guardrail. The majority of the paving on the project is anticipated to be completed by late September. The bridge deck replacement will be completed late December. The final finishing layer of asphalt may need to be completed next spring 2016. 

During paving operations the following interchanges on I-40 will be affected; Hipkoe Drive, North Park Drive, Transcon Lane and State Route 87. 

Workers will work on one interchange at a time. Motorists will need to travel to the next interchange, east or west of the one being worked on, to exit or enter the interstate. During construction of the SR 87 bridge deck, north bound traffic will remain open during the entire project while southbound traffic will be diverted to the Transcon interchange. 

Work hours will be 2 a.m. to sunset  on Monday through Friday. There will be narrow traffic lanes, wide load restrictions and a reduced speed limit through the work zones. Drivers are asked to use caution, watch for detour signs and be alert for construction equipment and personnel. 

For more information about this project, please call Rod Wigman at 928-308-8233, or email rwigman@azdot.gov.]]></description>
			<content:encoded><![CDATA[<p>The Arizona Department of Transportation will begin a road improvement project on Monday, June 15, to resurface eightteen miles of Interstate 40 through the city of Winslow (milepost 250-268). </p>
<p>The $9.3 million project will include removing and replacing the existing asphalt eastbound and westbound, removing and replacing the State Route 87 bridge deck, which crosses I-40, and installing new guardrail. The majority of the paving on the project is anticipated to be completed by late September. The bridge deck replacement will be completed late December. The final finishing layer of asphalt may need to be completed next spring 2016. </p>
<p>During paving operations the following interchanges on I-40 will be affected; Hipkoe Drive, North Park Drive, Transcon Lane and State Route 87. </p>
<p>Workers will work on one interchange at a time. Motorists will need to travel to the next interchange, east or west of the one being worked on, to exit or enter the interstate. During construction of the SR 87 bridge deck, north bound traffic will remain open during the entire project while southbound traffic will be diverted to the Transcon interchange. </p>
<p>Work hours will be 2 a.m. to sunset  on Monday through Friday. There will be narrow traffic lanes, wide load restrictions and a reduced speed limit through the work zones. Drivers are asked to use caution, watch for detour signs and be alert for construction equipment and personnel. </p>
<p>For more information about this project, please call Rod Wigman at 928-308-8233, or email <a href="mailto:rwigman@azdot.gov">rwigman@azdot.gov</a>.</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: ADOT Phoenix Weekend Highway Update		</title>
		<link>https://sedonaeye.com/az-interstate-15-virgin-river-gorge-bridge-project-update/comment-page-1/#comment-112038</link>

		<dc:creator><![CDATA[ADOT Phoenix Weekend Highway Update]]></dc:creator>
		<pubDate>Fri, 05 Jun 2015 16:20:00 +0000</pubDate>
		<guid isPermaLink="false">https://sedonaeye.com/?p=48191#comment-112038</guid>

					<description><![CDATA[Drivers should be aware of the following restrictions:

    Northbound Interstate 17 closed between Glendale and Peoria avenues from 9 p.m. Friday to 11 p.m. Saturday
    Eastbound Interstate 10 (toward Tucson) narrowed to one lane between Wild Horse Pass Boulevard and Riggs Road from 9 p.m. Friday to 8 a.m. Saturday and from 9 p.m. Saturday to 10 a.m. Sunday
    Southbound Interstate 17 closed overnight between Pioneer Road and State Route 74(Carefree Highway) from 11 p.m. Friday to 5 a.m. Saturday.

This has been your weekend of June 5-8, 2015 ADOT traffic alert update. ]]></description>
			<content:encoded><![CDATA[<p>Drivers should be aware of the following restrictions:</p>
<p>    Northbound Interstate 17 closed between Glendale and Peoria avenues from 9 p.m. Friday to 11 p.m. Saturday<br />
    Eastbound Interstate 10 (toward Tucson) narrowed to one lane between Wild Horse Pass Boulevard and Riggs Road from 9 p.m. Friday to 8 a.m. Saturday and from 9 p.m. Saturday to 10 a.m. Sunday<br />
    Southbound Interstate 17 closed overnight between Pioneer Road and State Route 74(Carefree Highway) from 11 p.m. Friday to 5 a.m. Saturday.</p>
<p>This has been your weekend of June 5-8, 2015 ADOT traffic alert update. </p>
]]></content:encoded>
		
			</item>
	</channel>
</rss>
