<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	
	>
<channel>
	<title>
	Comments on: ADOT Interstate 17 Repaving Project Continues	</title>
	<atom:link href="https://sedonaeye.com/adot-interstate-17-repaving-project-continues/feed/" rel="self" type="application/rss+xml" />
	<link>https://sedonaeye.com/adot-interstate-17-repaving-project-continues/</link>
	<description>Local News From All Points of View</description>
	<lastBuildDate>Mon, 02 Sep 2013 14:27:26 +0000</lastBuildDate>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.1</generator>
	<item>
		<title>
		By: Overnight Closures I-17 Sept 3-5		</title>
		<link>https://sedonaeye.com/adot-interstate-17-repaving-project-continues/comment-page-1/#comment-26313</link>

		<dc:creator><![CDATA[Overnight Closures I-17 Sept 3-5]]></dc:creator>
		<pubDate>Mon, 02 Sep 2013 14:27:26 +0000</pubDate>
		<guid isPermaLink="false">https://sedonaeye.com/?p=32089#comment-26313</guid>

					<description><![CDATA[This week the one-hour closures for AZ I-17 roadway construction, between midnight and 1 a.m., will occur Wednesday, Sept. 4 and Thursday, Sept 5.; next week the closure will occur Monday, Tuesday and Wednesday.
 
In addition to the one-hour closures, crews will intermittently close I-17 in both directions for up to 30 minutes at a time between 9 p.m. and 4 a.m. to allow a safe work zone as crews remove large amounts of dirt from the shoulder. 
 
Northbound I-17 will be stopped at State Route 169 and southbound I-17 traffic will be stopped at General Crook Trail until the work is completed and the roadway is reopened. 
 
During this construction project, bicyclists are not permitted through the project work zone at any time, as the shoulders along I-17 are closed. Bicyclists can bypass the work zone via State Route 169 for northbound riders or State Route 260 for southbound riders. 
 
In addition to the full closures, drivers can expect single-lane restrictions in both directions through the work zone between 8 p.m. and 6 a.m. Monday night through Friday morning. 
 
The work zone will be clearly marked by temporary barricades and signage. ADOT advises drivers to allow additional time to reach their destinations and to proceed through the work zone with caution, comply with the reduced speed limit, and be alert for construction equipment and personnel.]]></description>
			<content:encoded><![CDATA[<p>This week the one-hour closures for AZ I-17 roadway construction, between midnight and 1 a.m., will occur Wednesday, Sept. 4 and Thursday, Sept 5.; next week the closure will occur Monday, Tuesday and Wednesday.</p>
<p>In addition to the one-hour closures, crews will intermittently close I-17 in both directions for up to 30 minutes at a time between 9 p.m. and 4 a.m. to allow a safe work zone as crews remove large amounts of dirt from the shoulder. </p>
<p>Northbound I-17 will be stopped at State Route 169 and southbound I-17 traffic will be stopped at General Crook Trail until the work is completed and the roadway is reopened. </p>
<p>During this construction project, bicyclists are not permitted through the project work zone at any time, as the shoulders along I-17 are closed. Bicyclists can bypass the work zone via State Route 169 for northbound riders or State Route 260 for southbound riders. </p>
<p>In addition to the full closures, drivers can expect single-lane restrictions in both directions through the work zone between 8 p.m. and 6 a.m. Monday night through Friday morning. </p>
<p>The work zone will be clearly marked by temporary barricades and signage. ADOT advises drivers to allow additional time to reach their destinations and to proceed through the work zone with caution, comply with the reduced speed limit, and be alert for construction equipment and personnel.</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: Bob		</title>
		<link>https://sedonaeye.com/adot-interstate-17-repaving-project-continues/comment-page-1/#comment-26018</link>

		<dc:creator><![CDATA[Bob]]></dc:creator>
		<pubDate>Mon, 19 Aug 2013 16:41:02 +0000</pubDate>
		<guid isPermaLink="false">https://sedonaeye.com/?p=32089#comment-26018</guid>

					<description><![CDATA[thanks consider it noted, camp verde reader]]></description>
			<content:encoded><![CDATA[<p>thanks consider it noted, camp verde reader</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: ADOT Aug 19 &#38; 20 Update		</title>
		<link>https://sedonaeye.com/adot-interstate-17-repaving-project-continues/comment-page-1/#comment-26011</link>

		<dc:creator><![CDATA[ADOT Aug 19 &#38; 20 Update]]></dc:creator>
		<pubDate>Sun, 18 Aug 2013 17:28:53 +0000</pubDate>
		<guid isPermaLink="false">https://sedonaeye.com/?p=32089#comment-26011</guid>

					<description><![CDATA[The Arizona Department of Transportation will begin guardrail repairs on Monday and Tuesday, August 19 and 20, next week on Interstate 17 between 6 a.m. and 6 p.m. between General Crook Trail and the McGuireville rest area.
 
The work between mileposts 284-296 will require alternating lane restrictions in both directions and intermittent shoulder closures during work hours to provide a safe work zone for maintenance crews. No delays are expected.
 
The speed limit through the work zones will be reduced to 45 mph during work hours.]]></description>
			<content:encoded><![CDATA[<p>The Arizona Department of Transportation will begin guardrail repairs on Monday and Tuesday, August 19 and 20, next week on Interstate 17 between 6 a.m. and 6 p.m. between General Crook Trail and the McGuireville rest area.</p>
<p>The work between mileposts 284-296 will require alternating lane restrictions in both directions and intermittent shoulder closures during work hours to provide a safe work zone for maintenance crews. No delays are expected.</p>
<p>The speed limit through the work zones will be reduced to 45 mph during work hours.</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: Sherie Mercier, Prescott		</title>
		<link>https://sedonaeye.com/adot-interstate-17-repaving-project-continues/comment-page-1/#comment-26006</link>

		<dc:creator><![CDATA[Sherie Mercier, Prescott]]></dc:creator>
		<pubDate>Sun, 18 Aug 2013 14:25:41 +0000</pubDate>
		<guid isPermaLink="false">https://sedonaeye.com/?p=32089#comment-26006</guid>

					<description><![CDATA[Liked this article on Facebook.]]></description>
			<content:encoded><![CDATA[<p>Liked this article on Facebook.</p>
]]></content:encoded>
		
			</item>
	</channel>
</rss>
