<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	
	>
<channel>
	<title>
	Comments on: ADOT I-17 Guardrail Repair and Overnight Work Update	</title>
	<atom:link href="https://sedonaeye.com/adot-i-17-guardrail-repair-and-overnight-work-update/feed/" rel="self" type="application/rss+xml" />
	<link>https://sedonaeye.com/adot-i-17-guardrail-repair-and-overnight-work-update/</link>
	<description>Local News From All Points of View</description>
	<lastBuildDate>Wed, 20 Feb 2013 20:30:00 +0000</lastBuildDate>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.1</generator>
	<item>
		<title>
		By: Page AZ Road Buckles		</title>
		<link>https://sedonaeye.com/adot-i-17-guardrail-repair-and-overnight-work-update/comment-page-1/#comment-15291</link>

		<dc:creator><![CDATA[Page AZ Road Buckles]]></dc:creator>
		<pubDate>Wed, 20 Feb 2013 20:30:00 +0000</pubDate>
		<guid isPermaLink="false">https://sedonaeye.com/?p=25757#comment-15291</guid>

					<description><![CDATA[Buckled pavement closes US 89 south of Page - Detour will add 45 miles around closure using US 160 and SR 98

US 89 in northern Arizona is closed because a 150-foot section of pavement buckled this morning about 25 miles south of Page, according to the Arizona Department of Transportation.

The cause is not related to weather and may be a geologic event.

US 89 is closed northbound at US 89A, which takes traffic west toward Jacob Lake. In Page, US 89 is closed at the junction with State Route 98.

The alternate route to Page will take drivers east on US 160 to SR 98 (about 50 miles) and north on SR 98 to Page. The detour is about 45 miles longer than the direct route.

It is not known at this time how long the road will be closed.

For the latest highway conditions across Arizona, visit ADOT’s Travel Information site at www.az511.gov or call 5-1-1.]]></description>
			<content:encoded><![CDATA[<p>Buckled pavement closes US 89 south of Page &#8211; Detour will add 45 miles around closure using US 160 and SR 98</p>
<p>US 89 in northern Arizona is closed because a 150-foot section of pavement buckled this morning about 25 miles south of Page, according to the Arizona Department of Transportation.</p>
<p>The cause is not related to weather and may be a geologic event.</p>
<p>US 89 is closed northbound at US 89A, which takes traffic west toward Jacob Lake. In Page, US 89 is closed at the junction with State Route 98.</p>
<p>The alternate route to Page will take drivers east on US 160 to SR 98 (about 50 miles) and north on SR 98 to Page. The detour is about 45 miles longer than the direct route.</p>
<p>It is not known at this time how long the road will be closed.</p>
<p>For the latest highway conditions across Arizona, visit ADOT’s Travel Information site at <a href="http://www.az511.gov" rel="nofollow ugc">http://www.az511.gov</a> or call 5-1-1.</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: Highway Clean Up Feb 16		</title>
		<link>https://sedonaeye.com/adot-i-17-guardrail-repair-and-overnight-work-update/comment-page-1/#comment-15207</link>

		<dc:creator><![CDATA[Highway Clean Up Feb 16]]></dc:creator>
		<pubDate>Mon, 11 Feb 2013 18:23:13 +0000</pubDate>
		<guid isPermaLink="false">https://sedonaeye.com/?p=25757#comment-15207</guid>

					<description><![CDATA[There is a quarterly &quot;Leap Frog&quot; highway litter event scheduled for February 16, 2013 for all of Yavapai County.
 
Many Adopt-A-Highway groups will be on Highway 260 and Highway 89A during this &quot;Leap Frog&quot; litter event to restore the beauty to “America &#038; Arizona the Beautiful”.
 
Adopt-A-Highway groups from Dewey, Prescott Valley and Prescott will be in attendance on Highway 169, 69 and 89. 

Any Adopt-A-Highway groups that wish to have a helping hand or residents wishing to be a helping hand should contact Gary Chamberlain at (928) 202-1186 or email FolksvilleUSA@gmail.com so those needing and wanting help can be united.]]></description>
			<content:encoded><![CDATA[<p>There is a quarterly &#8220;Leap Frog&#8221; highway litter event scheduled for February 16, 2013 for all of Yavapai County.</p>
<p>Many Adopt-A-Highway groups will be on Highway 260 and Highway 89A during this &#8220;Leap Frog&#8221; litter event to restore the beauty to “America &amp; Arizona the Beautiful”.</p>
<p>Adopt-A-Highway groups from Dewey, Prescott Valley and Prescott will be in attendance on Highway 169, 69 and 89. </p>
<p>Any Adopt-A-Highway groups that wish to have a helping hand or residents wishing to be a helping hand should contact Gary Chamberlain at (928) 202-1186 or email <a href="mailto:FolksvilleUSA@gmail.com">FolksvilleUSA@gmail.com</a> so those needing and wanting help can be united.</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: ADOT Wickenburg AZ Travel Alert - WK Feb 11, 2013		</title>
		<link>https://sedonaeye.com/adot-i-17-guardrail-repair-and-overnight-work-update/comment-page-1/#comment-15240</link>

		<dc:creator><![CDATA[ADOT Wickenburg AZ Travel Alert - WK Feb 11, 2013]]></dc:creator>
		<pubDate>Mon, 11 Feb 2013 15:44:40 +0000</pubDate>
		<guid isPermaLink="false">https://sedonaeye.com/?p=25757#comment-15240</guid>

					<description><![CDATA[Paving work on SR 74 will impact drivers this week near Wickenburg AZ - Drivers should expect delays up to 30 minutes at SR 74 and US 60 junction.
 
Crews will continue paving State Route 74 this week that will require delays of up to 30 minutes at the US 60 and SR 74 junction, according to the Arizona Department of Transportation. 

Work hours are from 5 a.m. to 5 p.m. Tuesday through Friday.  

Drivers are encouraged to use alternate routes if possible and can expect delays of up to 30 minutes as traffic will be restricted to one lane and guided through work zone with a pilot car. 

The work is part of an ongoing 22-mile pavement preservation project that consists of removing a layer of the existing pavement, repaving the roadway and drainage improvements. No weekend or holiday work is scheduled on the project. Weather can affect a project schedule. 

The $9 million pavement improvement project is scheduled for completion by early summer.  

ADOT advises drivers to proceed through the work zone with caution, slow down, and be alert for construction equipment and personnel.]]></description>
			<content:encoded><![CDATA[<p>Paving work on SR 74 will impact drivers this week near Wickenburg AZ &#8211; Drivers should expect delays up to 30 minutes at SR 74 and US 60 junction.</p>
<p>Crews will continue paving State Route 74 this week that will require delays of up to 30 minutes at the US 60 and SR 74 junction, according to the Arizona Department of Transportation. </p>
<p>Work hours are from 5 a.m. to 5 p.m. Tuesday through Friday.  </p>
<p>Drivers are encouraged to use alternate routes if possible and can expect delays of up to 30 minutes as traffic will be restricted to one lane and guided through work zone with a pilot car. </p>
<p>The work is part of an ongoing 22-mile pavement preservation project that consists of removing a layer of the existing pavement, repaving the roadway and drainage improvements. No weekend or holiday work is scheduled on the project. Weather can affect a project schedule. </p>
<p>The $9 million pavement improvement project is scheduled for completion by early summer.  </p>
<p>ADOT advises drivers to proceed through the work zone with caution, slow down, and be alert for construction equipment and personnel.</p>
]]></content:encoded>
		
			</item>
	</channel>
</rss>
