<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	
	>
<channel>
	<title>
	Comments on: ADOT Begins Chino Valley Bridge Repairs	</title>
	<atom:link href="https://sedonaeye.com/adot-begins-chino-valley-bridge-repairs/feed/" rel="self" type="application/rss+xml" />
	<link>https://sedonaeye.com/adot-begins-chino-valley-bridge-repairs/</link>
	<description>Local News From All Points of View</description>
	<lastBuildDate>Tue, 01 Oct 2013 01:54:14 +0000</lastBuildDate>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.1</generator>
	<item>
		<title>
		By: Sherie Mercier, Prescott		</title>
		<link>https://sedonaeye.com/adot-begins-chino-valley-bridge-repairs/comment-page-1/#comment-27096</link>

		<dc:creator><![CDATA[Sherie Mercier, Prescott]]></dc:creator>
		<pubDate>Tue, 01 Oct 2013 01:54:14 +0000</pubDate>
		<guid isPermaLink="false">https://sedonaeye.com/?p=32672#comment-27096</guid>

					<description><![CDATA[Thanks for the update. It is appreciated.]]></description>
			<content:encoded><![CDATA[<p>Thanks for the update. It is appreciated.</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: Chino Valley Bridge Repair Update		</title>
		<link>https://sedonaeye.com/adot-begins-chino-valley-bridge-repairs/comment-page-1/#comment-27093</link>

		<dc:creator><![CDATA[Chino Valley Bridge Repair Update]]></dc:creator>
		<pubDate>Mon, 30 Sep 2013 22:51:46 +0000</pubDate>
		<guid isPermaLink="false">https://sedonaeye.com/?p=32672#comment-27093</guid>

					<description><![CDATA[Bridge work north of Chino Valley on SR 89 will affect drivers this week - Delays of up to 30 minutes are expected.

Construction has started to replace the Del Rio Ranch bridge on State Route 89, approximately eight miles north of Chino Valley. A temporary detour will be constructed around the work zone and paving is scheduled on the west side of the bridge starting tomorrow, Tuesday, October 1.

Drivers will be stopped for up to 30 minutes between 7 a.m. and 6 p.m. approaching each end of the bridge to allow paving equipment to access the new detour.

Traffic will be switched to the detour Thursday, October 3 starting at 6:30 a.m. The speed limit will be reduced to 35 mph through the work zone for the next three months. 

Initially work was scheduled to begin on the Big Chino Wash bridge but that work has now been shifted to the Del Rio bridge due to standing water under the Big Chino bridge. 

Work will resume on the Big Chino bridge once the work at Del Rio has been completed.

The work zone will be clearly marked by temporary barricades and signage. ADOT advises drivers to allow additional time to reach their destinations and to proceed through the work zone with caution, comply with the reduced speed limit, and be alert for construction equipment and personnel. If traveling with pets, carry a leash and potable water for unexpected delays.]]></description>
			<content:encoded><![CDATA[<p>Bridge work north of Chino Valley on SR 89 will affect drivers this week &#8211; Delays of up to 30 minutes are expected.</p>
<p>Construction has started to replace the Del Rio Ranch bridge on State Route 89, approximately eight miles north of Chino Valley. A temporary detour will be constructed around the work zone and paving is scheduled on the west side of the bridge starting tomorrow, Tuesday, October 1.</p>
<p>Drivers will be stopped for up to 30 minutes between 7 a.m. and 6 p.m. approaching each end of the bridge to allow paving equipment to access the new detour.</p>
<p>Traffic will be switched to the detour Thursday, October 3 starting at 6:30 a.m. The speed limit will be reduced to 35 mph through the work zone for the next three months. </p>
<p>Initially work was scheduled to begin on the Big Chino Wash bridge but that work has now been shifted to the Del Rio bridge due to standing water under the Big Chino bridge. </p>
<p>Work will resume on the Big Chino bridge once the work at Del Rio has been completed.</p>
<p>The work zone will be clearly marked by temporary barricades and signage. ADOT advises drivers to allow additional time to reach their destinations and to proceed through the work zone with caution, comply with the reduced speed limit, and be alert for construction equipment and personnel. If traveling with pets, carry a leash and potable water for unexpected delays.</p>
]]></content:encoded>
		
			</item>
	</channel>
</rss>
