Home » Posts tagged with "Triple A"

Prescott Fair Oaks Road Construction

Sedona AZ (October 8, 2017) – Be advised that Yavapai County will be performing road work on Fair Oaks Road in the Williamson Valley area of Prescott, Arizona. Work will include removing and replacing asphalt and soils in various locations, replacing existing guardrail, and overlaying the existing asphalt with new asphalt. Construction will begin October 9, 2017, and continue through October... 

ADOT Closes I-10 Loop 303 Ramps

Sedona AZ (October 6, 2017) – ADOT advises the traveling public that several ramps at Interstate 10/Loop 303 interchange will be closed this weekend. Traffic will use local routes until work on the new ramps is completed. While work on the soon-to-be-opened new ramp connections at the Interstate 10/Loop 303 interchange in Goodyear continues this weekend, several existing ramps will be closed... 

Chino Valley Road Work

Sedona AZ (September 19, 2017) – Yavapai County will be performing road work on Yuma Drive in Chino Valley beginning September 25 and continuing through December 4, 2017. Construction will consist of removing existing asphalt, installing various drainage improvements, and cutting native soil to improve sight distance in four areas on Yuma Drive. Construction areas include Otmo Drive, Pheasant... 

Dog on Lap While Driving: Unsafe and Illegal

Poco Diablo McGuire gives a Four Paws Up view of how to drive safely with furry pals in his new article as the Sedona Eye Pet Columnist. Welcome, Poco D! Sedona AZ (January 5, 2017) – While driving under the influence was once the major focus of safety on the road, distracted driving of all kinds has gained national attention in recent years. Texting and driving has proven to be the latest serious... 

New SR 89 bridge at Hell Canyon opens to traffic

New Hell Canyon Bridge on right depicts a wider, stronger structure which replaced the original 62-year-old SR 89 bridge on its left. Sedona AZ (June 27, 2016) – The new State Route 89 bridge at Hell Canyon is longer, wider and better able to accommodate commercial traffic between Prescott and Interstate 40 than the 62-year-old span it replaces. The Arizona Department of Transportation opened... 

ADOT Bell Road Project On Schedule

Sedona AZ (June 16, 2016) – Work is proceeding on the Arizona Department of Transportation’s $41.9 million project to build a new interchange connecting Bell Road and Grand Avenue (US 60) and reopen Bell Road to traffic by November 2016. Crews are focusing on paving the widened westbound portion of Grand Avenue near Bell Road. The work to pave the roadway and add temporary lane markings along... 

Memorial Day Weekend Safety Reminders

Sedona AZ (May 26, 2016) – The Coconino County Sheriff’s Office would like to remind all residents and visitors to Northern Arizona over the Memorial Holiday Weekend about some safety measures to keep your weekend enjoyable. The CCSO will conduct increased patrols throughout Coconino County roads, forests and waterways as part of our two-pronged approach of safety education and enforcement.... 

Sedona Uptown Paving Project on Schedule

Article submitted by City of Sedona AZ Sedona AZ (June 18, 2015) – The City of Sedona pavement repair work on AZ SR 89A in uptown Sedona is progressing on schedule. “While the uptown paving project has presented some challenges, the contractor has been very responsive to issues and kept the project on schedule,” states Andy Dickey, Assistant Community Development Director/City Engineer. Businesses... 

Arizona US 89 Improvement Project Begins

Sedona AZ (June 2, 2015) – Motorists traveling on AZ US 89 between Cameron and Page should allow for extra travel time as the Arizona Department of Transportation makes improvements to a seven-mile stretch of roadway from Gray Spot Wash to North Red Hill (mileposts 510-517), just south of the US 89/US 89A junction near Bitter Springs. Beginning on Monday, June 1, 2015, the two lane highway... 

AZ US 89 Scheduled to Reopen

Sedona AZ (March 11, 2015) –  Two years after a landslide ripped apart a 500-foot section of US 89 and split the communities of Bitter Springs and Page, the Arizona Department of Transportation anticipates reopening the highway to traffic on the afternoon of Friday, March 27, 2015, barring any potential weather delays or mechanical breakdowns during the paving process, which began today. Page... 
Copyright © 2008-2017 · Sedona Eye · All Rights Reserved · Posts · Comments · Facebook · Twitter ·